The Client:
Automotive Manufacturing Facility
The Problem:
Our client facility was in its second year of operation. There were significant inefficiencies + cost prohibitive aspects of the water system that were increasing plant downtimes and disrupting plant operations. The wastewater treatment system in place was functional during normal operations. However, there is a 35,000-gallon stage 1 tank which would dump an overage of concentrated waste to be treated. We identified this as the source of the problem and went to work designing a more optimal solution.
The Solution:
Following a survey and trial period, we implemented a 24/7 wastewater treatment program.
The Result:
In the year following the implementation of our treatment program, all wastewater from the facility was in compliance with state mandates. Wastewater treatment costs dropped from $12.50 per 1000 gallons to $4.50 per 1000 gallons of water treated — all with hands-off continuous treatment. Ultimately the new treatment program saved the facility $450,000 per year.
Ready To Get Started?